Performance Evaluation of Continuous Aeration Process in Wastewater Treatment Contaminated with Chrome Heavy Metal in Pilot Scale

Amin Allah Zarei1, Hamed Biglari2, Khaled Samiee Roudi3 and Razieh Khaksefidi4

1Department of Environmental Health Engineering, School of Public Health, Torbat Heydariyeh University of Medical Sciences, Torbat Heydariyeh, Iran.

2Department of Environmental Health Engineering, School of Public Health, Gonabad University of Medical Sciences, Gonabad, Iran.

3Department of Public Health, Khaf Integrated Health Education, Khaf, Iran.

4Department of Environmental Health Engineering, School of Public Health, Zahedan University of Medical Science, Zahedan, Iran.

Corresponding Author E-mail: r.khaksefidi110@gmail.com

DOI : http://dx.doi.org/10.13005/ojc/330649

Article Publishing History
Article Received on :
Article Accepted on :
Article Metrics
ABSTRACT:

The increasing pollution from urban and industrial wastewaters with toxic metal ions is an issue of environmental concern. This study investigated the efficacy of continuous aeration process for the removal of heavy chromium metal. This study is an experimental study in which the variables of initial concentration of Cr (0.3, 1, 1.5 mg/l), hydraulic retention time (2, 4, 6, 8 h) and input BOD5 concentration (100,150,200) mg/l of chromium was investigated in removal efficiency for continuous aeration reactor. The results showed that the chromium removal efficiency was 98.21 percent in 0.3 initial concentration, hydraulic retention time of 8 hours and input BOD5 200 mg. This study showed that the use of continuous aeration reactor has a high efficiency for the removal of chromium.

KEYWORDS:

Continuous Aeration; Heavy Metal; Chromium; Hydraulic Retention Time; Organic Loading

Download this article as: 

Copy the following to cite this article:

Zarei A. A, Biglari H, Roudi K. S, Khaksefidi R. Performance Evaluation of Continuous Aeration Process in Wastewater Treatment Contaminated with Chrome Heavy Metal in Pilot Scale. Orient J Chem 2017;33(6).


Copy the following to cite this URL:

Zarei A. A, Biglari H, Roudi K. S, Khaksefidi R. Performance Evaluation of Continuous Aeration Process in Wastewater Treatment Contaminated with Chrome Heavy Metal in Pilot Scale. Orient J Chem 2017;33(6). Available from: http://www.orientjchem.org/?p=40062


Introduction

An important class of environmental contaminants and serious human health risks are heavy metal and their concentrations in the environment have a direct relationship with urban sprawl and industrial development (1). Heavy metals are under consideration because of their toxicity and tendency to accumulate in living organisms and also tend to react with sulfur and disrupt vital enzymes (2-4). Heavy metals exist in metal industrial wastewater plating, mining, battery manufacturing plants, alloying, melting metals wastewater and may enter through the effluents of these industries in water sources (5,6). One of the most important heavy metals is chromium that is considered as a hazardous pollutant in the environment (7). Chromium through or waste disposal industries such as electroplating, tanning, dyeing and textile, metal processing ,leather, manure storage, etc. as the chromate and dichromate are leaks into water streams (8-12). Cr is found in nature as Hexavalent chromium and trivalent chromium Cr (VI). Hexavalent chromium compared with the highly toxic trivalent chromium is carcinogenic and mutagenic. The Cr (VI) was dissolved in water and can be very different pH bivalent anions such as chromate, dichromate and hydrogen chromate (13,14). If long-term exposure accrued with high levels of chromium and Upper standard, it causes problems such as damage to the lungs, kidneys, liver, nervous tissue, skin and gastrointestinal tract in humans (15,16). Standards for discharge wastewater in surface water is containing Cr 0.5 mg/l, drained well 1 mg/l and for agriculture and irrigation is 1 mg/l (17). Given the scarcity of water resources and the health and environmental risks of heavy metals such as chromium, practical and effective ways is considered to remove these contaminants from the environment (18). Various methods are to be noted such as chemical precipitation, ion exchange, reverse osmosis, membrane processes, electrical precipitation, adsorption, coagulation, biological methods, etc. (19-22). Most of these techniques have certain disadvantages such as high cost device operation, the need for additional chemicals, high energy consumption, need much space and not efficient at high concentrations (20, 23, 24). In recent years, the biological assembly process has been widely studied. Micro- organisms such as algae, fungi, bacteria, yeast, actinomycetes etc. has been used as adsorbents for heavy metals. Microbiological methods for the absorption of metals from wastewaters and easier than other methods are very small allotment of more expensive high operational efficiency. Small particle size, rate of growth, proliferation, low density, high strength, low cost and their separation has caused researchers should pay more attention to microbial adsorbents (25, 26). Bioaccumulation is the removal of heavy metals using the metabolism of microorganisms which have the ability to accumulate heavy metals (27). Many microorganisms have developed resistance to multiple metals and able to absorb within or outside the effect of these metals which pollutants on their cell micro-organisms is the function of their concentration in the environment. Therefore, biological accumulate is a method that uses microorganisms and reduce pollution of heavy metals in the environment (28). Activated sludge system with extended aeration is one of the refining process of aerobic suspended growth in the tank aerates the micro-level, high growth, and the stability and retention time on microbial lot, the treatment of wastewater with a high pollution is applicable (29). The purpose of this study was to evaluate the performance of the continuous aeration process in wastewater contaminated with heavy metal chromium.

Materials and Methods

This study is an experimental study in which a pilot scale reactor equipped with four diffusers for aeration. The reactor temperature, pH and DO were under control. Providing food for bacteria and the reactor inlet flow rate of the synthetic wastewater was used. For the construction of wastewater, Table 1 compounds were used (30-32). All materials used in this study were prepared from Merck, Germany. Returned to reactor wastewater treatment sludge as seeding Zahedan was added to each reactor. Then according to the specified volume, hydraulic retention time and the reactor inlet flow rate was adjusted. Continuous aeration was done dissolved oxygen concentrations were controlled by the DO to dissolved oxygen remains at a rate of about 3 milligrams per liter of. Permanently took reuse nutrients. According to the settled sludge in the settling tank (which it was calibrated) through specific sludge volume control valve is returned to the aeration basin. After three week favorable conditions provide for testing. The initial concentration of chromium (VI) was made using potassium dichromate and the concentration. BOD separately and simultaneously passed into the biofilm reactor was continuously aerated. In this study, the effect of initial Cr (VI) concentration factor (0.3,1,1.5 mg/l), hydraulic retention time (2,4,6,8 hours) and BOD5 input (100,150,200 mg/l) was studied in heavy chromium (VI) removal. In all cases, the retention time was considered 30 days. up to 12 hours and then the reaction should be absorbed by organisms in the sludge settling time of 4 hours was given. It should be noted that the temperature of the reactor by the elements adjusted 35 °C and pH environments using Hydrochloric Acid and Sodium Hydroxide 0.1 normal range of microbial growth that often the environment is neutral. Samples of wastewater containing Cr injected in reactors to absorption reaction accrue by organisms up to 12 hours and then the reaction should be given the sludge settling time of 4 hours. The sampled output of the secondary settling tank was done and was passed via 0.45 micron Whatman filter. Then, by adding nitric acid, the acid is maintained under cold chain conditions to recitations were transferred to the laboratory. Chromium measurements were performed using atomic absorption device, Varian 220A model. Equation 1 is used to calculate the efficiency of metal reduction: equation 1

Formula 1

Table 1: Materials used for the manufacture of synthetic wastewater (g/100 ml)

Materials Chemical formula g/100 ml
Ammonium acetate CH3COONH4 6
Sodium bicarbonate NaHCO3 10
Ferrous sulfate FeSO4.7H2O 1
Nickel sulfate NiSO4.7H2O 0.05
Iron chloride FeCL3.6H2O 0.05
Disodium hydrogen phosphate Na2HPO4.7H2o 3.3
Potassium hydrogen phosphate K2HPO4 2
Potassium dihydrogen phosphate Magnesium sulfate. KH2PO4 0.8
MgSO4.7H2O 0.05
Cobalt chloride COCL2 0.004
Sodium sulfate. Na2SO4 0.001
Calcium chloride CaCL2 0.3

 

Figure 1: Schematic of the reactor used in this study Figure 1: Schematic of the reactor used in this study


Click here to View figure

Results and Discussion

Effect of Hydraulic Retention Time on the Removal and Input BOD5 of Chrome Removal in Continuous Aeration Reactor

Continuous aeration efficiency for the removal of heavy metal chromium from wastewater by biological methods of sewage pollution as well as reduce the system was studied. Figures 2-4 show that the continuous aeration reactor, increasing the hydraulic retention time, increases removal rates at initial chromium concentration, but along the increase of chromium concentration in the reactor, the efficiency decreases. The results are such that the initial concentration of Cr 0.3 mg/l, the highest removal rates are observed after 8 hours (98.21%). But with increasing initial concentration of chromium to 1 and 1.5 mg/l, the elapsed time was 4 hours, the highest levels of chromium removal are achieved. Increase the amount of chromium for microorganisms causing microorganisms to rapidly absorb it from the environment and soon lots to remove it and continued to decline chromium concentration with increasing hydraulic retention time is used for microorganisms and removal efficiency is reduced compared to before. Hydraulic retention time is one of the important parameters of the operation of biological systems while providing adequate contact time between active microbial mass and treatment material, preventing swept mass of the cell away. Reducing the hydraulic retention time, there is no sufficient contact time between the metal chromium and microorganisms and not decomposition of chromium (VI) is removed from the reactor. Chua and et al, in a study conducted in 1998, concluded that in less hydraulic retention times, capacity in the presence of organic matter in terms of COD Cr is higher than the hydraulic retention time, the removal efficiency is a low. Namely the hydraulic retention times of 2 and 2.5 days in the presence of chromium removal decreased but slightly increased hydraulic retention time of 5 days removed (33). In a study of civil and colleagues in 1390, the results indicate that increasing the hydraulic retention time, COD removal efficiency increased and the best removal efficiency of hydraulic retention time of 8 hours and also increasing the COD removal efficiency decreased (34).

Figure 2: Effect of HRT and input BOD5 in Cr removal (concentration of Cr 0.3 mg/l)

Figure 2: Effect of HRT and input BOD5 in Cr removal (concentration of Cr 0.3 mg/l)

Click here to View figure

 

Figure 3: Effect of HRT and input BOD5 in Cr removal (Cr concentration of 1 mg/ ml)

Figure 3: Effect of HRT and input BOD5 in Cr removal (Cr concentration of 1 mg/ ml)


Click here to View figure

 

Figure 4: Effect of HRT and input BOD5 in Cr removal (Cr concentration of 1.5 mg / ml)

Figure 4: Effect of HRT and input BOD5 in Cr removal (Cr concentration of 1.5 mg / ml)

Click here to View figure

Effect of input BOD5 and initial concentration of chromium in continuous aeration reactor

Figures 5-8 also show that increasing the concentration of organic load into the reactor      in the presence of a fixed concentration of heavy metal, effectively increases the efficiency of the reactor. As the organic loading rate of chromium removal at an initial concentration of 200 ppm, Cr 0.3 mg of hydraulic retention time of 8 hours was about 98.21 percent. In aerobic wastewater treatment systems, if compliance with the emission of microorganisms, whereby the ability to absorb and metabolize organic loading will be within a certain range. However, it should be noted that the organic load increases over the span causes the growth of cell mass and their failure to form biological Fluke, most in the wastewater of organic load to be viewed. Previous studies showed that increasing the organic loading will increases substrate (35). In the study that mineral cartridge used as biofilm support biological treatment of wastewater, the results showed that with increasing organic loading remains in constant retention time, the  system efficiency increases in substrate remove (36).

Figure 5: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 2 hours

Figure 5: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 2 hours


Click here to View figure

 

Figure 6: Effect of BOD5 input(mg/l) and the initial concentration of chromium in hydraulic retention time of 4 hours

Figure 6: Effect of BOD5 input(mg/l) and the initial concentration of chromium in hydraulic retention time of 4 hours

Click here to View figure

Figure 7: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 6 hours

Figure 7: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 6 hours


Click here to View figure

 

Figure 8: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 8 hours

Figure 8: Effect of BOD5 input (mg/l) and the initial concentration of chromium in hydraulic retention time of 8 hours


Click here to View figure

Effect of Hydraulic Retention Time and the Initial Concentration of Chromium in Chromium Removal in Continuous Aeration Reactor

As Figures 9-11 shows, with increasing chromium concentration in the reactor, continuous aeration, the removal of chromium is reduced. So that the feed concentration 1.5 mg/l in input BOD5 and 200 ppm and retention time of 8 hours, the amount of chromium removal 12.8 percent lower than the concentrations in the initial 0.3 mg/l concentration and with the same hydraulic retention time and input BOD5. The results show that high concentrations of chromium (VI) are a deterrent for the growth of microorganisms and microbial growth is slow. Another reason for the slowdown in fixed-time is organic foods limits the number of microorganisms. Given a fixed amount of food, increasing the number or amount does not exceed the growth of microorganisms, because does not provide enough food. Studies on the removal of pollutants using pumice stone as a fixed bed biofilm showed that increasing the concentration of contaminants into the reactor, reduced system performance (35). In another study, the effect of the organic load changes on the removal efficiency of activated sludge biological reactor, propylene glycol has been studied concluded that increasing concentrations of input propylene glycol, substrate removal efficiency is reduced (37).

Figure 9: Effect of HRT and the initial concentration Chromium in initial BOD5 of 100 mg/l

Figure 9: Effect of HRT and the initial concentration Chromium in initial BOD5 of 100 mg/l


Click here to View figure

 

Figure 10: Effect of HRT and the initial concentration Chromium in initial BOD5 of 150 mg/l

Figure 10: Effect of HRT and the initial concentration Chromium in initial BOD5 of 150 mg/l 


Click here to View figure

 

Figure 11: Effect of HRT and the initial concentration Chromium in initial BOD5 of 200 mg/l

Figure 11: Effect of HRT and the initial concentration Chromium in initial BOD5 of 200 mg/l



Click here to View figure

 

Conclusions

The results showed that Cr (VI) removal by continuous aeration process is very dependent to input organic loading, hydraulic retention time of chromium concentration in the reactor and the maximum efficiency of the Cr 0.3, 1 and 1.5 mg/l in organic input load retention time of 8 hours and 200 mg is equal to 98.21, 82.67 and 79.84 percent respectively. Therefore, continuous aeration method can be used to remove chromium from industrial wastewater, as a useful, simple and high performance used in water and wastewater industry.

Acknowledgments

Hereby is appreciated to everyone who helped us in this study and we appreciate the Deputy of Research and Technology of Medical Sciences, Zahedan for the financial support of this research and also to provide the necessary facilities (project Number 5948).

References

  1. Ma, Y.; Egodawatta, P.; McGree, J.; Liu. A.; Goonetilleke, A. Sci. Total Environ. 2016, 557-558,764-772.
    CrossRef
  2. Malakul, P.; Srinivasan, K. R.; Wang, H. Y. Ind. Eng. Chem. Res. 1998, 37(11), 4296-4301
    CrossRef 
  3. Mohan, D.; Singh, K. P. Water Res. 2002, 36, 2304-2318
    CrossRef
  4. Xu, P.; Liu, L.; Zeng, G.; Huang, D.; Lai, C.; Zhao, M.; Huang, C.; Li, N.; Wei, Z.; Wu, H.; Zhang, C.; Lai, M.; He, Y. Appl. Microbiol Biotechnol. 2014, 98,6409–6418.
    CrossRef
  5. Verma, A.; Kumar, SH.; Kumar, S. J. Environ. Chem. Eng. 2016, 4(4), 4587-4599.
    CrossRef
  6. Andaleeb, F.; Anjum Zia, M.; Ashraf, M. J. Environ. Sci. 2008, 20, 1475-1480.
    CrossRef
  7. Rand, G. M. Fundamentals of aquatic toxicology, Second edition, Ecological Services Inc. 1995, 23, 338.
  8. Gupta, VK.; Shrivastava, AK.; Jain, N. Water Res. 2001, 35(17),4079-85. 5
  9. Ayangbenro, AS.; Babalola, O. Int. J. Environ. Res. Public Health. 2017,14(1). 94.
    CrossRef
  10. Mohamed, A.; Nasser, W. S.; Osman, T. A.; Toprak, M. S.; Muhammed, M.; Uheida, A. J. Colloid Interface Sci. 2017, 505, 682-691.
    CrossRef
  11. Chao, H.; Runhu, Z.; Fang, B.; Ping, L.; Xiangfeng, L. Chin. J. Chem. Eng. 2016, 25(2), 153-158.
  12. Hengli, X.; Haidong, Z.; Yan, X.; Min, Y.; Xiaolian, J.; Jiale, H.; Qingbiao, L.; Daohua, S. Sep. Purif. Technol. 2017, 174, 466-473.
    CrossRef
  13. Asadi, A.; Dehghani, M.; Zare, M; Rahmani, A.; Golestani far, H.; North Khorasan Uni. Med. Sci. J. 2011, 3(4), 7-13.
  14. Yasemin, S.; Ayten, O. Process Biochem. 2005, 40(5), 1895-1901.
    CrossRef
  15. Athanasios, G. T.; Evina, K.; Simos, M.; Vasilis, D.; Pantelis, P.; Evangelia, A. P.; Katherine, J. H. Appl. Clay Sci. 2017, ISSN 0169-1317.
  16. Bianca, M.; Ana, C. G.; Mariliz, G. Process Saf. Environ. Prot.  2015, 95, 195-201.
    CrossRef
  17. Rao, K.S.; Mohapatra, M.; Anand, S.; Venkateswarlu, P. Sci. Tech. 2010, 2(7), 81-103.
  18. Malkoc, E.; Nuhoglu, Y. J. Hazard. Mater. 2005, B127, 120–128.
    CrossRef
  19. Zouboulis, A. I.; Matis, K. A. Crit. Rev. Sci. Tech. 1997, 27(3),195-235.
    CrossRef
  20. Srivastava, S.K.; Gupta, K.V.; Mohan, D. J. Envir. Engrg. 1997, 5, 461-468.
    CrossRef
  21. Papageorgiou, S. K.; Katsaros, F. K.; Kouvelos, E. P.; Nolan, J. W.; Le, H.; Kanellopoulos, N. K. J.Hazard.Mater. 2006, 137, 1765-1772.
    CrossRef
  22. Afsharnia, M.; Saeidi, M.; Zarei, A.; Narooie, M. R.; Biglari. Electronic physician. 2016, 8(11), 3248-3256.
  23. Dizgea, N.; Keskinlera, B.; Barlas, H. J. Hazardous Materials. 2009, 167, 915–926.
    CrossRef
  24. Bazrafshan, E.; Zarei, A. A.; Kord Mostafapour, F. Desalin. Water Treat. 2015, 1-11.
  25. Ulaganathan, S.; Govindan, V. Environ. Prot. Eng. 2013, 39(3), 21-28.
  26. Das, N.; Vimala, R.; Karthika, P.Indian J. Biotechnol. 2008, 7, 159-169.
  27. Lefcort, H.; Aguon, M. Q.; Bond, K. A.; Chapman, K. R.; Clark, J.; Kornachuk, P.; Lang, B. Z.; Martin, J. C. Arch. Environ. Contam. Toxicol. 2002, 43, 34-41.
    CrossRef
  28. Metcaf and Eddy. Wastewater Engineering:Tretment,Disposal,Reuse Tata McGrow-Hill,4th, New Delhi, 2003.
  29. Zeinaddine, H. R.; Ebrahimi, A.; Alipour, V.; Rezaei, L. J. Health Sci. Surveillance Sys. 2013, 1(2), 89-93.
  30. Cadavid, D. L.; Zaiat, M.; Foresti, E. Water Sci. Technol. 1999, 39, 99-106.
    CrossRef
  31. Stefan, H.; Walter, T. J. Biotechno. 2001, 92(2), 95-101.
    CrossRef
  32. Chua, H. Sci. Total Environ. 1998, 214, 239-245.
    CrossRef
  33. Maleki, A.; Bahmani, P.; Ghahremani, A. Sci. J. Kurdistan Univ. Med. Sci. 2010, 48-55.
  34. Sharbat Maleki, M.; Borghei, M.; J. Water Wastewater. 2004, 56, 62-72.
  35. Kavoussi, A.; Borghei, M., Environ. Sci. 2004, 8, 29-42.
  36. Farzadkia, M.; Rezaei Kalantari, R.; Mousavi,G.; Jarfy, S.; Gholami, M. Sci. Environ. Techno. 2008, 11(2), 98-112.


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.